The large construction crane at the hotel and convention center is being taken down over the weekend.
On Saturday, the pieces were being removed by the crane itself, using a hydraulic lift that picks up the top of the crane just far enough to remove one section at a time, then lowers it to the level of the next section.
A crane operator said that the rest of the crane will be removed Sunday using a
large mobile crane that was brought in today.